The June 1, 2005 meeting of the SRP Freeholder Committee was held at the City of Bloomington Utilities and was called to order by SRP Chairman William Weber at 5:45pm.

 

Committee Members present:  Hank Berman, William Weber, Michael Grady, Mike Sonneborn, Rob Caserotti, Ed Roehling, Larry Polley, Roger Watkins, Mark Moser, and Boyd Sturdevant. Also present: Marty Mann, LLCD Chairman; Larry Ritter, LLCD Vice-Chairman; Bob Madden, Manager; Aunna Huber, Board Recorder; Rachel Atz, CBU Representative; and LLCD Freeholders (see attached sign-up sheet). Absent: Dave Keller, Gene Niednagel, Gail Tala, and Dennis Friesel.

 

MOTION BY SONNEBORN TO APPROVE MAY 4, 2005 MINUTES, SECONDED BY BERMAN.  ALL “AYES.”  MOTION CARRIED.

 

I.                   SRP DISPOSAL SITE PRESENTATION:

·        Roger Kottlowski, Commonwealth Engineers, reviewed the potential sediment disposal sites and selection of an appropriate site. (See SRP Binder for flow chart, map of sites, and presentation.)

·        Bathymetric study shows approximately 100,000 yards of sediment need to be removed.

·        No treatment needed for sediment.

·        Some arsenic found, but levels are normal for this area.

·        Used dredges with an 8-inch pipe can move material 2500 feet.

·        Used dredges with a 10-inch pipe can move material up to 1 mile.  (Roger recommends.)

·        The dredge can be operated after thaw and before freeze.

·        Possible to dredge during off-season to avoid boating problems.

·        10-inch dredge has 400 to 600 hp.

·        Can dredge 75% per day.  25% is set-up, takedown, and maintenance.

·        Used dredges run from $100,000 to $200,000.

·        Will need 2 additional workboats to bring fuel to dredge and rotate operators.

·        Will require 1 person to operate dredge and another to operate workboat.

 

II.                TOPICS FOR DISCUSSION:

·        Surveys to freeholders vs. committee representing constituents.

·        Choose 5 sites out of 15 and weigh pros and cons of selecting each site.

·        Goal when selecting these sites is to minimize controversy and the risk of failure.

·        Start matrix with 5 or 6 criteria to weigh best site selection.

 

III.             NEXT MEETING DATE AND ADJOURNMENT:

·         Next SRP meeting will be held on July 6, 2005 at 5:30pm. The meeting will be held at the City of Bloomington Utilities office on Morton Street.

MOTION BY POLLEY TO ADJOURN AT 8:20 P.M.  SECONDED BY SONNEBORN.  ALL “AYES.”  MOTION CARRIED.